Bathroom Renovation in Oxford
Full bathroom refurbishments in Oxford, including strip-out, waterproofing, plumbing, tiling, sanitaryware and ventilation — completed by one team with a single point of contact.
What a bathroom renovation includes
Bathrooms are the most technical rooms in a house because water, drainage and ventilation all have to work together. We treat the preparation as part of the finished job, not something to rush.
- Removal of the existing suite and tiles
- First-fix plumbing, drainage and electrics
- Tanking and moisture protection to walls and floors
- Plastering, tiling and floor preparation
- Bath, shower, basin, WC and towel rail installation
- Extractor fan, lighting and final sealing
Bathrooms in older Oxford homes
Many properties in Headington, Cowley and the city centre have bathrooms that were added long after the house was built, often with shallow drainage runs or vents that terminate in the loft. We check both before tiling begins. Where the floor needs to be raised or the drainage re-routed, we explain the options and the cost before work starts rather than after.
For smaller bathrooms, we plan storage into the walls and choose tiles and lighting that make the room feel larger. For family bathrooms, we look at layout first: how the door opens, where towels and toiletries live, and whether a separate shower is more useful than a bath.
Our process
- Visit and measure. We look at the room, the services and how you want to use it.
- Quotation. You receive an itemised price covering labour, preparation and installation.
- Strip-out and first fix. The old room is removed and the new services installed.
- Waterproofing and tiling. Tanking, tiling and preparation are completed and checked.
- Installation and handover. Fittings, sealing, testing and a final walk-through.
Walk-in showers and accessible bathrooms
We install walk-in showers, low-threshold trays and wet rooms, and can make adjustments for mobility without making the room look clinical. Grab rails, comfortable access and slip-resistant flooring can be built into the design from the start, which is far easier than retrofitting them later.
What affects the cost
- Room size and whether the layout changes
- Whether the suite is replaced in full or partly
- Tile choice and the area to be tiled
- Drainage, ventilation and any structural changes
- Accessory items such as underfloor heating or a heated towel rail
Frequently asked questions
How long does a bathroom refurbishment take?
A typical full refurbishment takes two to three weeks, including strip-out, waterproofing, tiling, installation and finishing. Larger rooms or structural changes take longer.
Can you fit a walk-in shower or wet room?
Yes. Wet rooms need careful falls in the floor and full tanking, which we plan at survey stage along with the drainage position.
Do you replace the whole suite?
We can replace everything or keep items that are still in good condition. If the room is being retiled, replacing the suite at the same time is usually more economical.
Why is ventilation so important?
Bathrooms generate a lot of moisture. A correctly sized extractor fan, ducted outside rather than into the loft, prevents damp and mould and protects the new finish.
Thinking about a new bathroom?
Tell us about the room and what you would like to change. We will visit, measure up and send a clear, itemised quotation.
Request your free quotation